找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪(fǎng)問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: ;

[復(fù)制鏈接]
樓主: Stimulant
21#
發(fā)表于 2025-3-25 06:49:59 | 只看該作者
22#
發(fā)表于 2025-3-25 07:57:23 | 只看該作者
23#
發(fā)表于 2025-3-25 15:11:29 | 只看該作者
https://doi.org/10.1007/978-3-658-36756-5tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
24#
發(fā)表于 2025-3-25 18:57:06 | 只看該作者
https://doi.org/10.1007/978-3-658-42268-4is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
25#
發(fā)表于 2025-3-25 23:19:23 | 只看該作者
Introduction,ns to be made on this subject was put forward by Mitrofanov [1]. With the increasing possibilities of being able to analyse and evaluate the resultant data with the aid of electronic data processing equipment, this method is becoming a practicable solution.
26#
發(fā)表于 2025-3-26 02:21:00 | 只看該作者
27#
發(fā)表于 2025-3-26 07:19:43 | 只看該作者
28#
發(fā)表于 2025-3-26 12:16:41 | 只看該作者
Parts Design, most work-intensive activities within the product design field of mechanical engineering. Attempts were therefore made at a very early stage to rationalize this crucial point. For that purpose the following methods are generally known
29#
發(fā)表于 2025-3-26 16:13:08 | 只看該作者
Process Planning,tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
30#
發(fā)表于 2025-3-26 19:38:42 | 只看該作者
Wage Structure,is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-6 13:05
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
株洲县| 金乡县| 军事| 太仆寺旗| 兴和县| 广河县| 双流县| 贵州省| 宿松县| 阆中市| 隆回县| 丁青县| 张北县| 新乡市| 道孚县| 柳林县| 昌邑市| 延川县| 庆安县| 桂平市| 黎城县| 赣州市| 韩城市| 湖北省| 获嘉县| 海安县| 临漳县| 吴堡县| 高雄市| 桃源县| 东至县| 白银市| 丽水市| 浑源县| 宁河县| 保德县| 呼伦贝尔市| 皮山县| 称多县| 安西县| 静乐县|