Titlebook: Electric Power System Planning; Issues, Algorithms a Hossein Seifi,Mohammad Sadegh Sepasian Book 2011 Springer-Verlag Berlin Heidelberg 201

[復(fù)制鏈接]
樓主: 積聚
31#
發(fā)表于 2025-3-26 23:55:31 | 只看該作者
https://doi.org/10.1007/978-3-642-17989-1Electrical Networks; GEP; Matlab; NEP; PSP; Power System Planning; SEP; Transmission
32#
發(fā)表于 2025-3-27 04:43:34 | 只看該作者
Power System Planning, Basic Principles,ing a large number of countries, or even continents. Nowadays, an electric power system is one of the man-made largest scale systems; ever made, comprising of huge number of components; starting from low power electric appliances to very high power giant turbo-generators. Running this very large sys
33#
發(fā)表于 2025-3-27 09:18:35 | 只看該作者
Optimization Techniques,ent) can be determined. For instance, in an ., the active power generations of power plants may be the decision variables. The dependent variables can be the total fuel consumption, system losses, etc. which can be calculated upon determining the decision variables. In a ., the locations and the siz
34#
發(fā)表于 2025-3-27 10:21:53 | 只看該作者
35#
發(fā)表于 2025-3-27 16:50:29 | 只看該作者
Load Forecasting, other words, such as, demand and consumption are also used instead of load, we use load as the most common term. The actual term is electric load; however, electric is omitted here and assumed to be obvious. It is well understood that both the energy (MWh, kWh) and the power (MW, kW) are the two ba
36#
發(fā)表于 2025-3-27 21:05:12 | 只看該作者
37#
發(fā)表于 2025-3-27 22:32:15 | 只看該作者
Substation Expansion Planning, with the least costs, various operational constraints are met. In the so-called Substation Expansion Planning (SEP), the problem is to determine the required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availab
38#
發(fā)表于 2025-3-28 02:16:10 | 只看該作者
Network Expansion Planning, a Basic Approach,ns were, somehow, accounted for, the modeling was very approximate and needs much further investigations. The so called . (NEP) process tries to find the optimum routes between the generation buses (determined in GEP phase) and the load centers (determined from load forecasting) via substations (det
39#
發(fā)表于 2025-3-28 06:53:55 | 只看該作者
40#
發(fā)表于 2025-3-28 11:41:40 | 只看該作者
Reactive Power Planning,tudes are, normally, of main concern, during the last, perhaps, two decades, voltage stability is also received attention in literature. In this section, we try to briefly, differentiate between these two aspects of voltage performance of a system. Following that, we review some of the indices which
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經(jīng)驗總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2026-1-17 19:40
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
天全县| 凤山县| 宜昌市| 华阴市| 高州市| 刚察县| 肇源县| 理塘县| 沾益县| 安宁市| 绵阳市| 邵阳市| 蒙阴县| 阿鲁科尔沁旗| 红桥区| 隆子县| 绥德县| 黄石市| 高唐县| 克拉玛依市| 广南县| 新安县| 锡林浩特市| 安新县| 田林县| 白山市| 南郑县| 华亭县| 嵊泗县| 宁津县| 浦县| 丰原市| 安达市| 台前县| 齐齐哈尔市| 广平县| 无棣县| 仙桃市| 祥云县| 扶余县| 六枝特区|