Maintaining Robust Schedules by Fuzzy Reasoningonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s
44#
發(fā)表于 2025-3-29 06:46:31 | 只看該作者
Book 1998we received papers for this issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.
45#
發(fā)表于 2025-3-29 09:03:47 | 只看該作者
https://doi.org/10.1057/9781137305497me Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.
46#
發(fā)表于 2025-3-29 11:54:57 | 只看該作者
https://doi.org/10.1007/978-3-662-03742-3Autodesk Inventor; Manufacturing; algorithms; capacity; control; control theory; decision making; fuzzy rea
47#
發(fā)表于 2025-3-29 17:17:11 | 只看該作者
978-3-642-08393-8Springer-Verlag Berlin Heidelberg 1998
48#
發(fā)表于 2025-3-29 22:21:52 | 只看該作者
49#
發(fā)表于 2025-3-30 00:15:26 | 只看該作者
https://doi.org/10.1057/9781137305497. customer service, manufacturing efficiency and inventory investment, involving both market and manufacturing insights. Master scheduling has traditionally been treated as a material-based planning tool, e.g. in the MRP II (manufacturing resource planning) approach to master scheduling. Capacity is
50#
發(fā)表于 2025-3-30 04:19:02 | 只看該作者
https://doi.org/10.1057/9781137305497 MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經(jīng)驗總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-8 14:00
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
遵义市| 垦利县| 苗栗县| 潜江市| 凯里市| 安庆市| 抚顺市| 茂名市| 汤阴县| 林甸县| 万源市| 浮梁县| 咸阳市| 浦县| 商丘市| 伊川县| 远安县| 乌鲁木齐市| 呼和浩特市| 昌平区| 镇赉县| 峡江县| 资溪县| 时尚| 若尔盖县| 平顶山市| 垣曲县| 临泽县| 大渡口区| 清远市| 东阳市| 洛浦县| 楚雄市| 伊金霍洛旗| 赤城县| 长子县| 新津县| 珲春市| 亚东县| 和静县| 洪湖市|