找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Analysis and Optimization of Systems; Proceedings of the 9 A. Bensoussan,J. L. Lions Conference proceedings 1990 Springer-Verlag Berlin Hei

[復(fù)制鏈接]
樓主: Heel-Spur
11#
發(fā)表于 2025-3-23 10:15:14 | 只看該作者
Two effective approaches for hydroelectric generation scheduling,he HSP is to determine the best substitution of hydro energy for thermal energy in electric generation so that the fuel cost is minimized while meeting the system load and constraints. In the first approach, HSP is formulated as an optimal control problem, for which multiplier method-based different
12#
發(fā)表于 2025-3-23 14:02:23 | 只看該作者
Iterative solution of a free-boundary problem arising in microscopic particle manipulation inside active is to determine the total force acting on the particle due to the flow inside the liquid induced by the gas jet. An iterative algorithm for the numerical solution of this problem is presented. The basic approach is to solve the flows in the liquid and gas separately with an assumed free-bounda
13#
發(fā)表于 2025-3-23 20:37:16 | 只看該作者
Optimality conditions for elliptic variational inequalities,or some abstract elliptic variational inequalities are obtained in the cases where the convex sets satisfy some smoothness conditions. The idea is to find optimality conditions first for some penalized problems by Ekeland’s Variational Principle then to pass limits to obtain the optimality condition
14#
發(fā)表于 2025-3-24 01:22:04 | 只看該作者
Minimax shape optimization problem for von Karman system,em is to find the boundary of the domain occupied by the body in such a way that the cost functional approximating the stiffness of the system in the equilibrium state is minimized. It is assumed that the volume of the body is constant. Moreover the function describing the boundary of the domain and
15#
發(fā)表于 2025-3-24 03:43:27 | 只看該作者
Optimality conditions for a parabolic time delay system,ns have been studied recently in Refs. [1]÷[7] and [11], [12]. In this paper, we consider an optimal boundary control problem for a linear parabolic system in which constant time delays appear in the equation and in the boundary condition simultaneously. Sufficient conditions for the existence of a
16#
發(fā)表于 2025-3-24 08:54:25 | 只看該作者
17#
發(fā)表于 2025-3-24 14:40:55 | 只看該作者
18#
發(fā)表于 2025-3-24 15:48:16 | 只看該作者
Optimality conditions for utility maximization in an incomplete market, way to “fictitiously” complete this market so that the optimal protfolio for the resulting completed market coincides with the optimal portfolio for the original incomplete market. A number of equivalent characterizations of the fictitious completion are given, and examples are provided.
19#
發(fā)表于 2025-3-24 22:58:07 | 只看該作者
20#
發(fā)表于 2025-3-25 00:04:38 | 只看該作者
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-15 09:20
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
江口县| 龙海市| 梅河口市| 都兰县| 平安县| 丹巴县| 惠州市| 道孚县| 瑞昌市| 巴彦县| 双柏县| 平远县| 深泽县| 本溪市| 宣威市| 连城县| 手游| 驻马店市| 集安市| 林州市| 墨竹工卡县| 兴山县| 乌鲁木齐县| 山丹县| 房山区| 七台河市| 南岸区| 千阳县| 专栏| 临西县| 望江县| 华安县| 光泽县| 白城市| 资溪县| 宁阳县| 临澧县| 尉氏县| 洛阳市| 姜堰市| 乌拉特后旗|