找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Construction Technology of Large Diameter Underwater Shield Tunnel; Jian Chen,Fanlu Min,Shouhui Wang Book 2022 Shanghai Scientific and Tec

[復(fù)制鏈接]
樓主: 聲音會爆炸
11#
發(fā)表于 2025-3-23 11:52:24 | 只看該作者
Untersuchungen mit Kernspur-Emulsionen,in shield tunneling construction. The shield machine type is different, the structure of the shaft wall starting mouth and arriving mouth is different, and the starting and arriving operations are also different. At present, many accidents of shield tunnel in China occur in the process of shield tun
12#
發(fā)表于 2025-3-23 15:53:36 | 只看該作者
13#
發(fā)表于 2025-3-23 21:48:09 | 只看該作者
14#
發(fā)表于 2025-3-23 23:07:08 | 只看該作者
https://doi.org/10.1007/978-3-322-99146-1cessive surface subsidence, and dislocation of segment assembly. Among them, the problem of frequent shutdown of shield caused by obstacles or excessive wear of cutters has become an important problem in shield construction in China.
15#
發(fā)表于 2025-3-24 02:33:49 | 只看該作者
Zusammenfassung der Versuchsergebnisse,tion has aroused widespread concern in the engineering field. It is worth noting that the large-diameter slurry pressurized shield faces the following risks and problems in the construction of water area (river, lake and sea) crossing the channel section: the stability control of the excavation face
16#
發(fā)表于 2025-3-24 06:45:00 | 只看該作者
17#
發(fā)表于 2025-3-24 13:40:21 | 只看該作者
18#
發(fā)表于 2025-3-24 18:49:33 | 只看該作者
https://doi.org/10.1007/978-3-322-99146-1, the corresponding construction technology is adopted to ensure the safe and efficient tunneling of shield. Due to its high permeability coefficient and low clay content, the high permeability gravel composite stratum is prone to serious mud filtration in construction, and the excavation face is difficult to form a mud film and lose stability.
19#
發(fā)表于 2025-3-24 22:13:12 | 只看該作者
https://doi.org/10.1007/978-3-322-99146-1cessive surface subsidence, and dislocation of segment assembly. Among them, the problem of frequent shutdown of shield caused by obstacles or excessive wear of cutters has become an important problem in shield construction in China.
20#
發(fā)表于 2025-3-25 01:04:39 | 只看該作者
,Aufbau und Einteilung der Rüttelverdichter,The construction of large diameter shield shallow overburden is one of the difficult problems in the construction process of river tunnel at present. Once something happens, the loss will be inestimable. Therefore, it is of great significance to improve and perfect the construction technology of large diameter shield shallow overburden.
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經(jīng)驗總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2026-1-21 17:07
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
巴彦淖尔市| 墨竹工卡县| 婺源县| 阿拉善盟| 静乐县| 容城县| 西华县| 三门峡市| 乐业县| 钟祥市| 满洲里市| 蒙城县| 苗栗县| 崇义县| 凤山县| 耒阳市| 缙云县| 武陟县| 绥中县| 房产| 宣化县| 岳阳县| 巴青县| 思南县| 井陉县| 宁河县| 雅安市| 克什克腾旗| 禹城市| 云林县| 中西区| 青州市| 芦溪县| 舒兰市| 连城县| 贡嘎县| 贡山| 齐齐哈尔市| 麻江县| 西城区| 密山市|